Register  |  Login
Search   
Manufacturing Case Study - Operating Environment
Fiberlok, Inc., Fort Collins, CO

  • Displaced Cooling Load: 10 Tons
  • Cooled Space: Manufacturing Processing Area
  • Cooling Season: June through September
  • Ice Bear®50® System Cooling Hours: 11:30 am – 10:00 pm, 10.5 hours
  • Average Ambient Peak Period Temperature: 83° F
  • Rooftop Average Peak Period Temperature: 100+° F
  • Utility: Fort Collins Utilities

Learn More:

System Configuration

Unit Performance

Manufacturing Case Study

Hover here, then click toolbar to edit content
 
(877) 5-ICEBEAR (877 542-3232) IceInfo@ice-energy.com